Design: Office Refurbishment at 5th Floor. High Quality VAV installation. Ductwork, Fan-Powered Boxes with terminal re-heat, BMS

Banco Santander



Pulse: Asset Barcoding, PPM Task Sheets, CAFM interface, fit-out contractor management, full record information, layered CAD drawings

Gresham Street



Completed Electronic Record information for all their UK Property Portfolio including their new 60,000m2 HQ in Fleet Street

Goldman Sachs


canada square

Pulse: Asset Barcoding, PPM Task Sheets, CAFM interface, maintenance review


H&S: AE duties

HSBC Canada Square



PPM asset tagging

HSBC Hamilton


TM44 Air Conditioning Inspection survey & report

Wood Street


event log

Development of Access database running behind our Pulse electronic record system to monitor changes to the record information system

Pulse Event Log


design fitout

Pulse: 6th Floor Fit-out (design)


M&E design project & site supervision



park street

PPM asset tagging, AE Duties

HSBC Park Street