Airports

qatar_airways

Survey , testing & remedial works associated with VAV system serving HQ Building in Abu Dhabi

Amiri Flight

 

chillers

Replacement of existing R11 & R12 Centrifugal chillers with 6 large chiller packages using ammonia refrigerant with adiabatic condensers

Chiller Replacements

 

british_airways

Pulse: Electronic record information, drawings, Safety File, manufacturers' information, commissioning data etc

Boadicea House

 

cranebank

Flight Simulator Training Modules (Cells 1, 4 & 5) – Pulse Record Information

Cranebank

 

boiler installation

TBA Boiler Installation – 15MW Gas Fired Boiler Installation Technical reviews & quality control

Boiler Installation

 

BACE Cargo

Technical reviews & quality control

BACE Cargo

 

Compass Centre Pulse

Pulse: Full record Information including altering existing drawings via survey measurements

Compass Centre

terminal_5

Design of 11kV electrical infrastructure

Terminal 5

 

terminal_4_lighting

Report on lighting levels at Heathrow T4 baggage chutes

T4 Baggage Lighting

 

terminal_4_lights

Report on lighting levels at Heathrow aircraft stands

T4 Stand Lighting

 

terminal_4_booths

Design of M&E services for ticket & baggage booths

T4 Pit Stop Booths

 

world cargo

Heathrow - New development, BA Cargo HQ. TSA reviewed operational Permits & Safe Systems of Work

World Cargo

 

Equipment Closets

Waterside Equipment Closets – PM / Quality control

Equipment Closets

 

boilers

TBE Boiler Installation – 10MW Gas Fired Boiler Installation Technical reviews & quality control

Boiler Installation